Recent Projects

Baker Supercharger Hub — Baker, CA
Client / Partner: Tesla | Location: Baker, CA — I-15 Corridor
Project Type: EV Charging Hub Development (DC Fast Charging)
Role: Developer & Owner
Scope of Work:
End-to-end development of a privately owned Tesla V4 Supercharger hub, including site acquisition, entitlement coordination, utility and electrical infrastructure planning, contractor oversight, and delivery to Tesla for commissioning and network integration.
Key Highlights / Outcomes:
-
One of California’s first privately developed Tesla V4 Supercharger hubs
-
Strategically located on the I-15 corridor between Los Angeles and Las Vegas
-
Designed for high-volume interstate EV traffic and long-distance travel
-
Delivered as a fully operational, Tesla-integrated charging destination
Installed Systems:
-
Tesla V4 Superchargers (DC Fast Charging)
-
Dedicated utility service and supporting electrical infrastructure


Wasco State Prison — Wasco, CA
Client / Agency: California Department of Corrections and Rehabilitation (CDCR)
Project Type: EV Charging Infrastructure (Level 2 Fleet Charging)
Location: Wasco State Prison — Wasco, California
Role: EV Infrastructure Contractor
Scope of Work:
Turnkey installation of EV charging infrastructure at an active CDCR correctional facility, including installation of Level 2 charging stations, electrical panel upgrades, conduit and trenching, equipment installation, testing, and commissioning in accordance with CDCR and DGS requirements.
​
Key Highlights / Outcomes:
-
Completed within an active, high-security correctional facility
-
Work performed in compliance with CDCR security protocols and DGS standards
-
Coordinated inspections, testing, and commissioning for agency acceptance
-
Delivered a safe, reliable fleet charging solution supporting CDCR operations
Installed Systems:
-
Dual Level 2 EV charging stations for fleet use
-
Electrical distribution upgrades and supporting infrastructure
-
Site safety features including wheel stops, bollards, and signage


Rolling Hills Estates — Los Angeles County, CA
Client / Owner: Multifamily Residential Property Owner
Project Type: EV Charging Infrastructure (Level 2)
Location: Rolling Hills Estates — Los Angeles County, California
Role: EV Infrastructure Contractor
Scope of Work:
Turnkey installation of Level 2 EV charging infrastructure for a multifamily residential community, including electrical panel upgrades, conduit routing, charger installation, and commissioning. The system was designed with capacity to support future expansion as EV adoption increases.
Key Highlights / Outcomes:
-
Installed an additional three (3) Level 2 charging stations with infrastructure sized for future expansion to thirteen (13) chargers
-
Integrated charging within an active residential parking garage
-
Coordinated electrical upgrades to support increased load demand
-
Delivered a scalable, resident-ready EV charging solution
​
Installed Systems:
-
Level 2 EV charging stations
-
Electrical panel upgrades and load capacity improvements
-
Conduit, mounting hardware, and supporting infrastructure


Petaluma & Sonoma EV Projects — Northern CA
Client / Agency: California State Parks & Recreation (California Parks)
Project Type: EV Charging Infrastructure (Level 2)
Location: Petaluma & Sonoma — Northern California
Role: EV Infrastructure Contractor
Project Status: Under Construction
Scope of Work:
Ongoing delivery of Level 2 EV charging infrastructure across multiple California State Parks facilities, including installation of charging stations, electrical infrastructure upgrades, panel modifications, testing, and commissioning in accordance with California Parks, DGS, and applicable state standards.
Key Highlights / Outcomes:
-
Installation of seven (7) Level 2 charging stations across multiple State Parks facilities
-
Work coordinated across active public-use sites with minimal disruption
-
Electrical upgrades, testing, and commissioning being performed for agency acceptance
-
Delivering a consistent, code-compliant charging solution across all locations
Installed / In-Progress Systems:
-
Level 2 EV charging stations
-
Electrical infrastructure upgrades and panel modifications
-
Site safety elements including bollards, wheel stops, and signage





